Facility
We move orders quickly and efficiently through our 25,000 square foot shop and office building. Built in 1996, the shop and grounds were carefully designed for optimum throughput, safety and ergodynamics.

Materials
Incoming material is checked for purchase order requirements prior to acceptance. Material composition and mechanical test results are verified to comply with specifications before jobs are released for processing. Material traceability is maintained throughout production.

Packaging
Shipping department employees are proud of their record of no damage in shipment. Careful packing of easily damaged parts ensures their safe arrival at your facility.

Shipping
Our 10 ton overhead crane is utilized for both unloading of raw materials and loading of large finished parts. A four foot high dock and fork lift equipment allow for safe and efficient material handling and loading of trucks.